3No new 1.4MW cooling towers and 200mm pipework distribution system. |
|
 |
Ventilation systems to provide cooling to the thermo-molecular pump rooms and exhaust ductwork from the pumps. |
|
 |
Compressed air distribution system and a central vacuum cleaning system. |
|
 |
Bottled gas facility incorporating 6No different bottled gases, with pipework distribution systems. |
|
 |
Heating by means of gas fired radiant heaters installed at high level. |
|
 |
Extension to the existing site softened water system. |
|
 |
Ventilation and domestic services to the new offices and changing accommodation. |
|
 |
New high voltage power supplies derived from the existing site HV switchboard. |
|
 |
New 11kV/400V dual 2.5MVA transformer package sub-station. |
|
 |
Primary distribution to supply the building, together with dedicated process equipment connections. |
|
 |
Lighting to achieve 300 lux utilising high bay type luminaires with separate task area illumination. |
|
 |
Comprehensive analogue addressable fire alarm system. |
|
 |
General power and data comms. |
|
 |
Dedicated control and monitoring interfaces with the existing site process digital control system |