Sprinkler protection to the American NFPA standard throughout the warehouse and office areas, including in-rack protection. |
|
 |
VRV comfort cooling for the office areas together with domestic water, waste and ventilation services to the associated toilet areas. |
|
 |
Heating to the warehouse ancillary areas by means of a gas fired boiler installation with radiators, and separate warm air heating system to the warehouse. |
|
 |
Separate comfort cooling and FM200 fire suppression systems to the computer and comms rooms. |
|
 |
Building Management System |
|
 |
New 2MVA sub-station with power distribution throughout the facility, including to the 23No dock levelers and switch gear for the tenant’s fit out process equipment. |
|
 |
Small power via bus bars and floor boxes to the office areas. |
|
 |
High bay lighting to the warehouse and pick engine areas. |
|
 |
Lighting to conform to LG3:2001 to the office areas. |
|
 |
Emergency lighting throughout the building and external lighting to the car park areas. |
|
 |
Analogue addressable Fire Alarm system throughout the building. |
|
 |
Security, CCTV and cable management systems. |
|
 |
Lifts within the office areas to serve three floors. |
|
 |
Lightning protection system to the building. |